FINISHING OF WOODEN HOUSES (AFTER SHRINKAGE)


A wooden log house made of a beam or timber, laid under the roof, must stand for at least 6 months before the finishing works. During this period, the construction will give the main shrinkage and further changes in the height of the walls as a result of drying out of the wood material will not affect the appearance and functionality of the house. Finishing of wooden houses is a complex of finishing works for wooden houses and buildings. Finishing of wooden house is carried out both outside and inside. We carry out complex repair and finishing of wooden houses.
We provide the following services separately or in complex:
GRINDING OF LOG
Cleaning of the logs' surface
of minordamages and remains
of old cover.
ANTISEPTIZING
Special wood processing to protect it against mold, mildew and rot.
LOG`S CAULKING
Removing of the gaps between logs for tightness and moisture protection.
LOG`S PAINTING
External and internal painting of the house`s surfaces for protection from natural phenomena.
LOG`S SEALING
Insulation of seams of wooden house by sealant, using the technology “warm seam”.
DECORATION WITH ROPE
Finishing by jute rope of seams of a log house.
FRAMING OF WINDOW AND DOOR APERTURES
Framing of door and window apertures for protection against pressure during shrinkage of the house. Installation of doors and windows.
INSTALLATION OF ROOF
The rafters, lathing and counter rail, steam- and water proofing, OSB, roofing, gutters, filing of overhangs.
LEVELING AND TRIMMING OF LOG`S ANGLES
Alignment of angles of a log house in one size.
CONDUCTING OF COMMUNICATIONS
Carrying out of all communications in the house: electricity, water, sewage, heating.
INSTALLATION OF WOODEN FLOOR
Installation of logs, heat insulation, draft floor, finishing floor covering.
MONTAGE OF FRAME PARTITIONS
Installation of interroom frame partitions of wood or gypsum plasterboard.
COVERING OF WALLS AND PARTITIONS
Installation of lining, false timber, block house.
DECORATION OF WOODEN HOUSES (AFTER SHRINKAGE) ON A "TURNKEY" BASIS
The complex of finishing works for wooden houses and buildings.

Exclusive

In stock

In stock

Delivery and payment

dostavka

Contacts

Time work:
from 9:00 to 18:00
seven days a week

Phones:
(044) 338-62-05
(068) 338-62-05
(095) 209-62-05

E-mail:
info@nvo-wood.com.ua